1073 | This is my Second PRR | Compliance Monitoring | Initial Comment | A | Munusamy, Sudakar (CAISO) | Normal | 8/8/2018 |
IC: 0
RC: 0 |
1072 | Test PRR Title | BPM Change Management | Initial Comment | C | Munusamy, Sudakar (CAISO) | Emergency | 8/8/2018 |
IC: 0
RC: 0 |
1071 | Changes related to dispatch operating target tariff clarification | Market Operations | Initial Comment | C | Batakji, Jamal (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1070 | Monthly gas prices for demand response net benifits test | Market Instruments | Initial Comment | C | Batakji, Jamal (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1069 | Remove all references to the conceptual statewide plan | Transmission Planning Process | Initial Comment | C | DeShazo, Gary (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1068 | EIM area flow constraint definition | Energy Imbalance Market | Initial Comment | A | Batakji, Jamal (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1067 | Generator modeling data requirement | Transmission Planning Process | Recommendation Comment | B | Billinton, Jeffrey (CAISO) | Normal | 7/2/2018 |
IC: 2
RC: 0 |
1066 | Approved project sponsor report requirement | Transmission Planning Process | Recommendation Comment | B | Billinton, Jeffrey (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1065 | Registration cost monthly validation process update | Market Instruments | Recommendation Comment | A | Batakji, Jamal (CAISO) | Normal | 7/2/2018 |
IC: 1
RC: 0 |
1064 | Energy storage and distributed energy resources updates | Metering | Recommendation Comment | A | Namburi, Priyanka (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1063 | Modification to section 6 to include additional net qualifying capacity language | Reliability Requirements | Recommendation Comment | A | Katta, Gautham (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1062 | Revised and combined scheduling coordinator training and testing sections | Scheduling Coordinator Certification and Termination | Recommendation Comment | A | Payton, Julia (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1061 | Resource Interconnection Management System and Miscellaneous Updates | Managing Full Network Model | Recommendation Comment | B | Liang, Vivian (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1060 | Updated BPM configuration guide for pre-calculation resource adequacy availability incentive mechanism to accommodate demand response auction mechanism resource adequacy waivers and non-resource specific system resource adequacy exemptions | Settlements and Billing | Recommendation Comment | B | Peacock, Bonnie (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1059 | Changes due to congestion revenue rights | Outage Management | Recommendation Comment | C | Katta, Gautham (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1058 | Updated BPM configuration guide for pre-calculation resource adequacy availability incentive mechanism to accommodate generator availability resource adequacy issue | Settlements and Billing | Final Decision | B | Kwong, Jennifer (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1057 | Updated sections with reference to reliability inbox with customer inquiry and dispute interface (CIDI) and added availability assessment hours for 2019 | Reliability Requirements | Final Decision | A | Woody, Kyle (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1056 | Clarifications to existing generator retirement processes including public posting | Generator Management | Final Decision | A | Bradley, Joanne (CAISO) | Normal | 7/2/2018 |
IC: 1
RC: 0 |
1055 | Update the pre-calculation metered subsystem deviation penalty quantity configuration to properly account for MSS instructed imbalance energy for a MSS load following resource with no day ahead award but dispatched in real time market | Settlements and Billing | Final Decision | B | Kwong, Jennifer (CAISO) | Normal | 7/2/2018 |
IC: 2
RC: 0 |
1054 | Real-Time communications options | Direct Telemetry | Final Decision | A | Namburi, Priyanka (CAISO) | Normal | 7/2/2018 |
IC: 0
RC: 0 |
1053 | Flexible ramping requirements clarification | Market Operations | Final Decision | A | Batakji, Jamal (CAISO) | Emergency | 7/2/2018 |
IC: 0
RC: 0 |
1052 | Process of addressing market issues | Market Operations | Closed | B | Batakji, Jamal (CAISO) | Normal | 6/14/2018 |
IC: 0
RC: 0 |
1051 | Flexible ramping clarification | Energy Imbalance Market | Closed | A | Batakji, Jamal (CAISO) | Emergency | 6/14/2018 |
IC: 0
RC: 0 |
1050 | Process for adding energy storage between the Phase I and Phase II studies | Generator Interconnection and Deliverability Allocation Procedures | Withdrawn | A | Wright, Linda (CAISO) | Normal | 6/14/2018 |
IC: 0
RC: 0 |
1049 | Update to charge codes 3303, 6470, 6482, and 6488 to correct the locational marginal pricing used to settle exceptional dispatch energy for metered subsystem net resources | Settlements and Billing | Closed | B | Peacock, Bonnie (CAISO) | Emergency | 5/16/2018 |
IC: 0
RC: 0 |